4.3 General Standards
4.3.1 Scope:the quality acceptance of the erection project of pipes for the thermal power plants.Visual examination and cleaning of pipes is shown in Table 4.3.1-1,The prefabrication of pipes is shown in Table 4.3.1-2.The inspection and erection of valves is shown in Table 4.3.1-3.
4.3.2 Inspection quantity:detailed inspection shall be carried out according to the items.
4.3.3 Quality criteria:in accordance with the requirements in Table 4.3.1-1 to Table 4.3.1-3.
Table 4.3.1-1 Visual examination and cleaning of pipes
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_46.jpg?sign=1738906082-QRtFnn5vUnQBxh3vm1vzrLNyECGkV4zq-0-4fb8fc6f60e7a0936159998a5ad1c43f)
Table 4.3.1-1(Continued)
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_47.jpg?sign=1738906082-Ufl9r4VtBkVAC6RIyYBdxTmTP128lmMd-0-72587ba37d71b6051602d7728ffc1f25)
Table 4.3.1-2 Prefabrication of pipes
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_48.jpg?sign=1738906082-JhnAtzt8iyPzmy5HzAx6qBsVoFUluyVI-0-6cd36bf9fb00ad9e3772394d4830fbd3)
Table 4.3.1-3 Inspection and erection of valves
![img](https://epubservercos.yuewen.com/6CF431/18000634801101506/epubprivate/OEBPS/Images/txt004_49.jpg?sign=1738906082-EA1HKz6LQTlHlzPiIH6zMIH0vn2khv7k-0-d320ba70cbb0eee333f81ea39b908fed)